Piping Project

Piping Works


S.No Customer Location Current Project Trade Remarks
1 Keppel Shipyard (Tuas) Tuas Yard FPSO SHELL STONES PIPING  
2 Keppel Shipyard (Tuas) Tuas Yard ARMADA ALI PIPING  
3 Keppel Shipyard (Tuas) Tuas Yard KRAKEN PIPING  
4 PPL Shipyard Pte Ltd Tuas Crescent P2053 PIPING   
5 PPL Shipyard Pte Ltd Tuas Crescent P2052 PIPING  
6 Kensteel Nautical Yard Shipyard Crescent B366 PIPING   
7 Kensteel Nautical Yard Shipyard Crescent M963 PIPING   
8 DYNA-MAC Engineering Services Pte. Ltd Gul Road KRAKEN M40 PIPING   
9 DYNA-MAC Engineering Services Pte. Ltd Gul Road FPSO Catcher PIPING   
10 DYNA-MAC Engineering Services Pte. Ltd Gul Road Zadco PIPING   
11 Caspian Shipyard Company LLC  BAKU M1133 PIPING  BAKU

Piping Job Track Record - 2008 to 2015


Sno  Vessel Name System Name Job Scope Duration
  Kim Heng Marine & Oilfield Pte Ltd        
1 B303(Fel's) AP, BO, BW, CB, DD, EC, FW, MR, OF, VS,
WB, WD, WP, WS
Blk-51,52,53, &54
Fabrication, Installation & Testing
October-08 March-09
  Kim Heng Shipbuilding & Engineering Pte Ltd        
1 H1010 Winch Drag Brake Cooling Water, Fresh water desalination, Air Compressor & Deck sucuper & drain system. Fabrication, Installation & Testing March-09 January-10
  Keppel Shipyard Limited (Tuas)        
1 FPSO BW Pioneer Marine gas oil, Deisel Oil, instrument, Compressor, Plant air , Sewage line, Nitrogen, Scupper drain, Fire water, Steam condensate, & fuel & inert Gas Fabrication, Installation & Testing February-09 January-10
2 FPSO Jag Layak (TGT)-vessel Cargo Offload, Heating coil, Oily Water,
Steam supply, Over board discharge sys.
Fabrication, Installation & Testing October-10 July-11
3 FPSO Jag Layak (TGT)-Topside Module 20,40,50,60 Fabrication, Installation & Testing October-10 August-11
4 FPSO Aseng Helideck Fire line and Drain line sys. Fabrication, Installation & Testing November-10 July-11
5 Cidade de Anchieta Sewage, Steam, Bilge & Topside job Fabrication, Installation & Testing May-11 May-12
6 FPSO Berantai (East Fortune) Hook-Up line, Module-P3,P5,S2,S3,S8  Fabrication, Installation & Testing August-11 May-12
7 FPSO OSX 2 Ballast, bilge, Deck Seal, Cargo, etc Fabrication, Installation & Testing February-12 June-13
8 FPSO D1 Drain Line Fabrication, Installation & Testing March-12 February-13
9 LAM SON FPSO Helideck Fire line and Drain line sys. Fabrication, Installation & Testing March-13 June-13
10 FPSO Xikomba Steam, Fire, And Ballast system Fabrication, Installation & Testing April-12 November-14
11 ARMADA CLAIRE Drain line, Fire line at helideck and top side job Fabrication, Installation & Testing March-13 November-14
12 FPSO C7 Heating Coil system Fabrication, Installation & Testing November-13 On-going
13 ARMADA ALI All engine room jobs Fabrication, Installation & Testing August-14 On-going
14 FPSO SHELL STONES VARIOUS SYSTEM Like for like, modify, install & Test. November-13 On-going
15 KRAKEN VARIOUS SYSTEM Fabrication, Installation & Testing Apr-15 On-going
  Keppel Shipyard Limited (Benoi)        
1 Boss I PG, PL, OW, GF Install and Test  November-13 May-14
2 Castorone Sprinkler, Steam and Fresh water system Fabrication and transportation September-11 October-12
  Keppel Shipyard Limited (GUL)        
1  Bully - I Bilge,Ballst,Air vent, Sound, Overboard,  Swater of Sponson tank job Fabrication, Installation & Testing December-09 April-11
2  Bully - II Bilge,Ballst,Air vent, Sound, Overboard,  Swater of Sponson tank job Fabrication, Installation & Testing May-10 August-11
  Dyna-Mac Engineering        
1 FPSO BP Angola Various system at Module 7B Fabrication, Installation & Testing February-10 October-10
2 Ilhabela Various system at Module Fabrication, Installation & Testing October-10 May-11
3 ARMADA CLAIRE Various system at Module Fabrication, Installation & Testing February-13 October-13
4 Blk-353 (Fels Job) Various system at Module Fabrication, Installation & Testing Jul-13 October-13
5 FPSO Stone MODULE 11 and MODULE 14  Fabrication, Installation & Testing April-14 December-15
6 CDS  MODULE TS264 (Various High Pressure system) MANIFOLD - TS264 AND TS265 March-14 Complete
7 CDS  MODULE TS265 (Various High Pressure system) INTEGRATION October-14 Complete
8 TUN TULLON MODULE 5S  (Various High Pressure system) Installation, Test and Re-instatmenet Feb-15 Mar-15
9 KRAKEN MODULE M40  (Various High Pressure system) Fabrication, Installation & Testing Apr-15 On-going
10 Catchure MODULE M11  (Various High Pressure system) Fabrication, Installation & Testing Jun-15 Plan to Start
11 Zadco CPAU10 – Gas Compressor Train (With Inst MTR),
SPAU02 – LT Drain, MP KO Drum & MP Gas Cooler
Fabrication, Installation & Testing Jul-15 Plan to Start
  KENSTEEL SHIPYARD        
1 B351 Drill Water, Bilge, Preload Tank Stripping system, Low Pressure Mud Mix and Charging system, Vent, Sounding sys, Sanitary Drainage, Raw Water / Salt Water, Compressed Air, Preload Tank Fill and Dupping System. VARIOUS SYSTEM June-14 August-14
2 B364 Drill Water, Bilge, Preload Tank Stripping system, Low Pressure Mud Mix and Charging system, Vent, Sounding sys, Sanitary Drainage, Raw Water / Salt Water, Compressed Air, Preload Tank Fill and Dupping System. VARIOUS SYSTEM August-14 October-14
3 B366 Drill Water, Bilge, Preload Tank Stripping system, Low Pressure Mud Mix and Charging system, Vent, Sounding sys, Sanitary Drainage, Raw Water / Salt Water, Compressed Air, Preload Tank Fill and Dupping System. VARIOUS SYSTEM October-14 January-15
4 M962 Drill Water, Bilge, Preload Tank Stripping system, Low Pressure Mud Mix and Charging system, Vent, Sounding sys, Sanitary Drainage, Raw Water / Salt Water, Compressed Air, Preload Tank Fill and Dupping System. VARIOUS SYSTEM January-15 Mar-15
5 M963 Drill Water, Bilge, Preload Tank Stripping system, Low Pressure Mud Mix and Charging system, Vent, Sounding sys, Sanitary Drainage, Raw Water / Salt Water, Compressed Air, Preload Tank Fill and Dupping System. VARIOUS SYSTEM Apr-15 On-going
  Keppel Fel's Limited        
1 B348 LQ Potable Water (Cold & Hot), Fire Water Hot, Chilled Water, Foam, Compressed Air. Fabrication, Installation and Testing July-13 November-14
2 B349 Derrick - Compressed Air, Hydraulic & Mud Conditioning systems Fabrication, Installation and Testing December-13 May-14
3 B350 Derrick - Compressed Air, Hydraulic & Mud Conditioning systems Fabrication, Installation and Testing December-13 May-14
4 B354 Derrick - Compressed Air, Hydraulic & Mud Conditioning systems Fabrication, Installation and Testing May-14 January-15
5 M1235 Diesel Fuel Oil, Compressed Air, Quick Closing Valve Hydraulic, Raw water / Salt Water / Preload, Hydraulic Cantilver pipe, Drill Floor Skidding, Rig Floor Hydraulic sys, Mud Conditioning, Mud Process, Low Pressure Mud Mixing, Low Pressure Mud Charging & Sanitary Drainage. Fabrication, Installation and Testing Jun-14 On-going
  ROS        
1 KRAKEN MODULE M40  (Various High Pressure system) Fabrication, Installation & Testing May-15 On-going
  PPL Shipyard limited        
1 P2050 Ballast, Bilge, Brine, Chilled Water, Fire Water, Drain Water, Sea Water Cooling, Potable Water, High Pressure Jetting sys, High Pressure Mud system, Low Pressure Mud, Lub Oil, Base Oil, Fuel Oil, Dirty Oil, Compressed Air, Tank Vent, Tank Sounding, Crancase Venting, Sewage/Sanitary Drain, Bulk/Cement etc. Fabrication and Installation February-13 August-14
2 P2053 Ballast, Bilge, Brine, Chilled Water, Fire Water, Drain Water, Sea Water Cooling, Potable Water, High Pressure Jetting sys, High Pressure Mud system, Low Pressure Mud, Lub Oil, Base Oil, Fuel Oil, Dirty Oil, Compressed Air, Tank Vent, Tank Sounding, Crancase Venting, Sewage/Sanitary Drain, Bulk/Cement etc. Fabrication and Installation June-14 On-going
3 P2053 ( Structure) Cement Unit Founding, Drain Sump, Breaking Resistor & Cantilever Skidding Control Foundation, Cable Drum Foundation, Coaming Layout, Crane Pedestal, Water Tight Manhole, Raw Water Tower / Support, Paint Locker, UPS & Emergency Gen.Room, Disel Oil Tank in Gen.Room, Exhaust Pipe Support, Mooring System Arrangement, Towing System Arrangement, Walkway / Anchor rack service Platform, Handrail, Jetting Pipe & hose Service Platform, Service platform / handrail / Ladder on Jack case, Access Platform / Drain box for leg, Anchor Rack and Reinforcement, Main Engine Exhaust Silencer Support, Service Platform for Boom Rest, Cantilever Drag Chain Support, Loading Station Platform, Cable Penetration Box. Fabrication and Installation February-15 On-going
4 P2052 Ballast, Bilge, Brine, Chilled Water, Fire Water, Drain Water, Sea Water Cooling, Potable Water, High Pressure Jetting sys, High Pressure Mud system, Low Pressure Mud, Lub Oil, Base Oil, Fuel Oil, Dirty Oil, Compressed Air, Tank Vent, Tank Sounding, Crancase Venting, Sewage/Sanitary Drain, Bulk/Cement etc. Fabrication and Installation Apr-15 On-going
5 P2052 ( Structure) Cement Unit Founding, Drain Sump, Breaking Resistor & Cantilever Skidding Control Foundation, Cable Drum Foundation, Coaming Layout, Crane Pedestal, Water Tight Manhole, Raw Water Tower / Support, Paint Locker, UPS & Emergency Gen.Room, Disel Oil Tank in Gen.Room, Exhaust Pipe Support, Mooring System Arrangement, Towing System Arrangement, Walkway / Anchor rack service Platform, Handrail, Jetting Pipe & hose Service Platform, Service platform / handrail / Ladder on Jack case, Access Platform / Drain box for leg, Anchor Rack and Reinforcement, Main Engine Exhaust Silencer Support, Service Platform for Boom Rest, Cantilever Drag Chain Support, Loading Station Platform, Cable Penetration Box. Fabrication and Installation Mar-15 On-going


FPSO OSX 2

Ballast, bilge, Deck Seal, Cargo, etc

Fabrication, Installation & Testing

February-12

June-13

CDS

MODULE TS264 (Various High Pressure system)

MANIFOLD - TS264 AND TS265

March-14

Complete

B348

LQ Potable Water (Cold & Hot), Fire Water Hot, Chilled Water, Foam, Compressed Air.

Fabrication, Installation and Testing

July-13

November-14

P2050

Ballast, Bilge, Brine, Chilled Water, Fire Water, Drain Water, Sea Water Cooling, Potable Water, High Pressure Jetting sys, High Pressure Mud system, Low Pressure Mud, Lub Oil, Base Oil, Fuel Oil, Dirty Oil, Compressed Air, Tank Vent, Tank Sounding, Crancase Venting, Sewage/Sanitary Drain, Bulk/Cement etc.

Fabrication and Installation

February-13

August-14

P2053

Ballast, Bilge, Brine, Chilled Water, Fire Water, Drain Water, Sea Water Cooling, Potable Water, High Pressure Jetting sys, High Pressure Mud system, Low Pressure Mud, Lub Oil, Base Oil, Fuel Oil, Dirty Oil, Compressed Air, Tank Vent, Tank Sounding, Crancase Venting, Sewage/Sanitary Drain, Bulk/Cement etc.

Fabrication and Installation

June-14

On-going